| Model | MMD-03-3 | MMD-05-3 | MMD-1-3 | MMD-2-3 | |
| *Throughput | Suggest Feeding Rates (KG/HOUR) | 3~6 | 8~12 | 25~40 | 80~100 |
| CBD Throughput (KG/HOUR) | 2~4 | 6~8.5 | 20~30 | 60~70 | |
| Whole System Vacuum Degree | 0.01mbar/1Pa | ||||
| Evaporator *3 Units | Evaporation Area (M²) | 0.3 m² | 0.5 m² | 1.0 m² | 2.0 m² |
| nternal Condensation Area (M²) | 0.6 m² | 1.0 m² | 2.0 m² | 4.0 m² | |
| Evaporator Outside Diameter (mm) | 230mm/9.1" | 350mm/13.8" | 510mm/20.1'' | 690mm/27.2" | |
| Evaporator Inside Diameter (mm) | 150mm/5.9'' | 200mm/7.9'' | 305mm/12'' | 510mm/20.1'' | |
| Evaporator Height (mm) | 450mm/17.7'' | 800mm/31.5‘’ | 1050mm/41.3'' | 1200mm/47.2'' | |
| Wiper Style | Scraper | ||||
| Wiper Material | SS316L(Support) / PTFE+ Graphite composited (Wiper blade) | ||||
| Sealing Type | Magnetic Sealing | ||||
| Rotor Motor Power (W) | 120 | 200 | 400 | 750 | |
| Speed Regulation Mode | Variable Frequency Drive / VFD | ||||
| Max. Rotate Speed (RPM) | 140 RPM | ||||
| Max. Temperature | 280°C | ||||
| Dehydration & Degassing Feeding Vessel | |||||
| Volume(L) | 50 L | 50 L | 100 L | 200 L | |
| Heating Method | Electrical Heating | ||||
| Heating Power (KW) | 2 KW | 4 KW | 5 KW | 6 KW | |
| Stirring Power (W) | 200W | 370W | 550W | 550W | |
| Max. Stirring Speeding (RPM) | 50 | 40 | 30 | 25 | |
| Feeding Filter | Filtration Bore Diameter (UM) | 50~100 | 50~100 | 50~100 | 50~100 |
| Capacity (L/HOUR) | 50 | 100 | 150 | 200 | |
| Feeding Pump | Flowing Rate (L/HOUR) | 10 | 20 | 50 | 100 |
| Lift (Mpa) | 0.2 Mpa | 0.2 Mpa | 0.2 Mpa | 0.2 Mpa | |
| Power (W) | 120W | 200 W | 200W | 400W | |
| Transfer Pump Between Stages/Magnetic Driving Pump*2 Sets | Flowing Rate (L/HOUR) | 10 | 20 | 50 | 100 |
| Lift (Mpa) | 0.3 Mpa | 0.3 Mpa | 0.3 Mpa | 0.3 Mpa | |
| Power (W) | 120W | 200 W | 200W | 370W | |
| Discharging Pump /Magnetic Driving High Precise Gear Pump*4 Sets | Flowing Rate (L/HOUR) | 10 | 20 | 50 | 100 |
| Lift (Mpa) | 0.3 Mpa | 0.3 Mpa | 0.3 Mpa | 0.3 Mpa | |
| Power (W) | 120W | 200 W | 200W | 370W | |
| Heating Preservation | Method | Jacketed Insulation, Secondary Heater Provide Heating Separately | |||
| Heat Tracing Parts | All the transfer pipelines, transfer pump, feeding pump and discharge pumps | ||||
| Support Frame | Material | SUS 304 | |||
| General Information | Dimension (L*W*H / meter) | 2.5*2.0*2.4 | 3.3*2.4*2.4 | 4.3*5.0*4.5 | 13.0*5.8*5.4 |
| Weight (KG) | 750 | 1250 | 2250 | 2880 | |
| Power (KW) | 23 | 30 | 100 | 138 | |
| Optional: | Replace Traditional Dry Ice or Liquid Nitrogen | ||||
| Optional A./ Super Cryogenic Machine | Temperature Range (°C) | -80°C~RT | |||
| Refrigeration Power (W) | 1471 W | 2206 W | 2942 W | 4413 W | |
| Lift (Meter) | 15 M | 15 M | 18 M | 20 M | |
| Circulation Rate (L/HOUR) | 8 | 10 | 12 | 15 | |
| Optional B./ Super Cryogenic Machine B. | Temperature Range (°C) | -120°C~RT | |||
| Refrigeration Power (W) | 2800 W | 4400 W | 5800 W | 8400 W | |
| Lift (Meter) | 15 M | 15 M | 18 M | 20 M | |
| Circulation Rate (L/HOUR) | 8 | 10 | 12 | 15 | |
| Compare Difference stages Machine | 1st. Stage Product Receiving | 2nd. Stage Product Receiving | 3rd. Stage Product Receiving | Product Color | Remark |
| 1Stage Machine | CBD+THC |
/ |
/ |
Deep Color | Have to run 3 passes at least to achieve the requirements of Isolation and should remove terpenes before distillation. |
| 2 Stages Machine | Terpenes | CBD+THC |
/ |
Deep Color | Probably need run 2 passes to achieve the requirements of Isolation. |
| 3 Stages Machine | Terpenes | CBD+THC (THC here decrease 30% compare with 2 stages machine product) | CBD+THC (THC here increase 50% compare with 2 stages machine product) | Golden Yellow | Just one pass running to achieve the requirements of Isolation. Yield coefficient increase about 30% compare to 2 stages machine. |